Title 30

PART 7

Part 7 - Testing By Applicant Or Third Party

PART 7 - TESTING BY APPLICANT OR THIRD PARTY Authority:30 U.S.C. 957. Source:53 FR 23500, June 22, 1988, unless otherwise noted.

30:1.0.1.2.5.1SUBPART A
Subpart A - General
30:1.0.1.2.5.1.1.1SECTION 7.1
   7.1 Purpose and scope.
30:1.0.1.2.5.1.1.2SECTION 7.2
   7.2 Definitions.
30:1.0.1.2.5.1.1.3SECTION 7.3
   7.3 Application procedures and requirements.
30:1.0.1.2.5.1.1.4SECTION 7.4
   7.4 Product testing.
30:1.0.1.2.5.1.1.5SECTION 7.5
   7.5 Issuance of approval.
30:1.0.1.2.5.1.1.6SECTION 7.6
   7.6 Approval marking and distribution record.
30:1.0.1.2.5.1.1.7SECTION 7.7
   7.7 Quality assurance.
30:1.0.1.2.5.1.1.8SECTION 7.8
   7.8 Post-approval product audit.
30:1.0.1.2.5.1.1.9SECTION 7.9
   7.9 Revocation.
30:1.0.1.2.5.1.1.10SECTION 7.10
   7.10 MSHA acceptance of equivalent non-MSHA product safety standards.
30:1.0.1.2.5.2SUBPART B
Subpart B - Brattice Cloth and Ventilation Tubing
30:1.0.1.2.5.2.1.1SECTION 7.21
   7.21 Purpose and effective date.
30:1.0.1.2.5.2.1.2SECTION 7.22
   7.22 Definitions.
30:1.0.1.2.5.2.1.3SECTION 7.23
   7.23 Application requirements.
30:1.0.1.2.5.2.1.4SECTION 7.24
   7.24 Technical requirements.
30:1.0.1.2.5.2.1.5SECTION 7.25
   7.25 Critical characteristics.
30:1.0.1.2.5.2.1.6SECTION 7.26
   7.26 Flame test apparatus.
30:1.0.1.2.5.2.1.7SECTION 7.27
   7.27 Test for flame resistance of brattice cloth.
30:1.0.1.2.5.2.1.8SECTION 7.28
   7.28 Test for flame resistance of rigid ventilation tubing.
30:1.0.1.2.5.2.1.9SECTION 7.29
   7.29 Approval marking.
30:1.0.1.2.5.2.1.10SECTION 7.30
   7.30 Post-approval product audit.
30:1.0.1.2.5.2.1.11SECTION 7.31
   7.31 New technology.
30:1.0.1.2.5.3SUBPART C
Subpart C - Battery Assemblies
30:1.0.1.2.5.3.1.1SECTION 7.41
   7.41 Purpose and effective date.
30:1.0.1.2.5.3.1.2SECTION 7.42
   7.42 Definitions.
30:1.0.1.2.5.3.1.3SECTION 7.43
   7.43 Application requirements.
30:1.0.1.2.5.3.1.4SECTION 7.44
   7.44 Technical requirements.
30:1.0.1.2.5.3.1.5SECTION 7.45
   7.45 Critical characteristics
30:1.0.1.2.5.3.1.6SECTION 7.46
   7.46 Impact test.
30:1.0.1.2.5.3.1.7SECTION 7.47
   7.47 Deflection temperature test.
30:1.0.1.2.5.3.1.8SECTION 7.48
   7.48 Acid resistance test.
30:1.0.1.2.5.3.1.9SECTION 7.49
   7.49 Approval marking.
30:1.0.1.2.5.3.1.10SECTION 7.50
   7.50 Post-approval product audit.
30:1.0.1.2.5.3.1.11SECTION 7.51
   7.51 Approval checklist.
30:1.0.1.2.5.3.1.12SECTION 7.52
   7.52 New technology.
30:1.0.1.2.5.4SUBPART D
Subpart D - Multiple-Shot Blasting Units
30:1.0.1.2.5.4.1.1SECTION 7.61
   7.61 Purpose and effective date.
30:1.0.1.2.5.4.1.2SECTION 7.62
   7.62 Definitions.
30:1.0.1.2.5.4.1.3SECTION 7.63
   7.63 Application requirements.
30:1.0.1.2.5.4.1.4SECTION 7.64
   7.64 Technical requirements.
30:1.0.1.2.5.4.1.5SECTION 7.65
   7.65 Critical characteristics.
30:1.0.1.2.5.4.1.6SECTION 7.66
   7.66 Output energy test.
30:1.0.1.2.5.4.1.7SECTION 7.67
   7.67 Construction test.
30:1.0.1.2.5.4.1.8SECTION 7.68
   7.68 Firing line terminals test.
30:1.0.1.2.5.4.1.9SECTION 7.69
   7.69 Approval marking.
30:1.0.1.2.5.4.1.10SECTION 7.70
   7.70 Post-approval product audit.
30:1.0.1.2.5.4.1.11SECTION 7.71
   7.71 Approval checklist.
30:1.0.1.2.5.4.1.12SECTION 7.72
   7.72 New technology.
30:1.0.1.2.5.5SUBPART E
Subpart E - Diesel Engines Intended for Use in Underground Coal Mines
30:1.0.1.2.5.5.1.1SECTION 7.81
   7.81 Purpose and effective date.
30:1.0.1.2.5.5.1.2SECTION 7.82
   7.82 Definitions.
30:1.0.1.2.5.5.1.3SECTION 7.83
   7.83 Application requirements.
30:1.0.1.2.5.5.1.4SECTION 7.84
   7.84 Technical requirements.
30:1.0.1.2.5.5.1.5SECTION 7.85
   7.85 Critical characteristics.
30:1.0.1.2.5.5.1.6SECTION 7.86
   7.86 Test equipment and specifications.
30:1.0.1.2.5.5.1.7SECTION 7.87
   7.87 Test to determine the maximum fuel-air ratio.
30:1.0.1.2.5.5.1.8SECTION 7.88
   7.88 Test to determine the gaseous ventilation rate.
30:1.0.1.2.5.5.1.9SECTION 7.89
   7.89 Test to determine the particulate index.
30:1.0.1.2.5.5.1.10SECTION 7.90
   7.90 Approval marking.
30:1.0.1.2.5.5.1.11SECTION 7.91
   7.91 Post-approval product audit.
30:1.0.1.2.5.5.1.12SECTION 7.92
   7.92 New technology.
30:1.0.1.2.5.6SUBPART F
Subpart F - Diesel Power Packages Intended for Use in Areas of Underground Coal Mines Where Permissible Electric Equipment is Required
30:1.0.1.2.5.6.1.1SECTION 7.95
   7.95 Purpose and effective date.
30:1.0.1.2.5.6.1.2SECTION 7.96
   7.96 Definitions.
30:1.0.1.2.5.6.1.3SECTION 7.97
   7.97 Application requirements.
30:1.0.1.2.5.6.1.4SECTION 7.98
   7.98 Technical requirements.
30:1.0.1.2.5.6.1.5SECTION 7.99
   7.99 Critical characteristics.
30:1.0.1.2.5.6.1.6SECTION 7.100
   7.100 Explosion tests.
30:1.0.1.2.5.6.1.7SECTION 7.101
   7.101 Surface temperature tests.
30:1.0.1.2.5.6.1.8SECTION 7.102
   7.102 Exhaust gas cooling efficiency test.
30:1.0.1.2.5.6.1.9SECTION 7.103
   7.103 Safety system control test.
30:1.0.1.2.5.6.1.10SECTION 7.104
   7.104 Internal static pressure test.
30:1.0.1.2.5.6.1.11SECTION 7.105
   7.105 Approval marking.
30:1.0.1.2.5.6.1.12SECTION 7.106
   7.106 Post-approval product audit.
30:1.0.1.2.5.6.1.13SECTION 7.107
   7.107 New technology.
30:1.0.1.2.5.6.1.14SECTION 7.108
   7.108 Power package checklist.
30:1.0.1.2.5.7SUBPART J
Subpart J - Electric Motor Assemblies
30:1.0.1.2.5.7.1.1SECTION 7.301
   7.301 Purpose and effective date.
30:1.0.1.2.5.7.1.2SECTION 7.302
   7.302 Definitions.
30:1.0.1.2.5.7.1.3SECTION 7.303
   7.303 Application requirements.
30:1.0.1.2.5.7.1.4SECTION 7.304
   7.304 Technical requirements.
30:1.0.1.2.5.7.1.5SECTION 7.305
   7.305 Critical characteristics.
30:1.0.1.2.5.7.1.6SECTION 7.306
   7.306 Explosion tests.
30:1.0.1.2.5.7.1.7SECTION 7.307
   7.307 Static pressure test.
30:1.0.1.2.5.7.1.8SECTION 7.308
   7.308 Lockwasher equivalency test.
30:1.0.1.2.5.7.1.9SECTION 7.309
   7.309 Approval marking.
30:1.0.1.2.5.7.1.10SECTION 7.310
   7.310 Post-approval product audit.
30:1.0.1.2.5.7.1.11SECTION 7.311
   7.311 Approval checklist.
30:1.0.1.2.5.7.1.12.1APPENDIX Appendix I
   Appendix I to Subpart J of Part 7
30:1.0.1.2.5.8SUBPART K
Subpart K - Electric Cables, Signaling Cables, and Cable Splice Kits
30:1.0.1.2.5.8.1.1SECTION 7.401
   7.401 Purpose and effective date.
30:1.0.1.2.5.8.1.2SECTION 7.402
   7.402 Definitions.
30:1.0.1.2.5.8.1.3SECTION 7.403
   7.403 Application requirements.
30:1.0.1.2.5.8.1.4SECTION 7.404
   7.404 Technical requirements.
30:1.0.1.2.5.8.1.5SECTION 7.405
   7.405 Critical characteristics.
30:1.0.1.2.5.8.1.6SECTION 7.406
   7.406 Flame test apparatus.
30:1.0.1.2.5.8.1.7SECTION 7.407
   7.407 Test for flame resistance of electric cables and cable splices.
30:1.0.1.2.5.8.1.8SECTION 7.408
   7.408 Test for flame resistance of signaling cables.
30:1.0.1.2.5.8.1.9SECTION 7.409
   7.409 Approval marking.
30:1.0.1.2.5.8.1.10SECTION 7.410
   7.410 Post-approval product audit.
30:1.0.1.2.5.8.1.11SECTION 7.411
   7.411 New technology.
30:1.0.1.2.5.9SUBPART L
Subpart L - Refuge Alternatives
30:1.0.1.2.5.9.1.1SECTION 7.501
   7.501 Purpose and scope.
30:1.0.1.2.5.9.1.2SECTION 7.502
   7.502 Definitions.
30:1.0.1.2.5.9.1.3SECTION 7.503
   7.503 Application requirements.
30:1.0.1.2.5.9.1.4SECTION 7.504
   7.504 Refuge alternatives and components; general requirements.
30:1.0.1.2.5.9.1.5SECTION 7.505
   7.505 Structural components.
30:1.0.1.2.5.9.1.6SECTION 7.506
   7.506 Breathable air components.
30:1.0.1.2.5.9.1.7SECTION 7.507
   7.507 Air-monitoring components.
30:1.0.1.2.5.9.1.8SECTION 7.508
   7.508 Harmful gas removal components.
30:1.0.1.2.5.9.1.9SECTION 7.509
   7.509 Approval markings.
30:1.0.1.2.5.9.1.10SECTION 7.510
   7.510 New technology.