Title 30

PART 56 SUBPART E

Subpart E - Explosives Source:61 FR 36795, July 12, 1996, unless otherwise noted.

30:1.0.1.8.29.5.47SUBJGRP 47
Storage
30:1.0.1.8.29.5.47.1SECTION 56.6000
   56.6000 Definitions.
30:1.0.1.8.29.5.47.2SECTION 56.6100
   56.6100 Separation of stored explosive material.
30:1.0.1.8.29.5.47.3SECTION 56.6101
   56.6101 Areas around explosive material storage facilities.
30:1.0.1.8.29.5.47.4SECTION 56.6102
   56.6102 Explosive material storage practices.
30:1.0.1.8.29.5.47.5SECTION 56.6130
   56.6130 Explosive material storage facilities.
30:1.0.1.8.29.5.47.6SECTION 56.6131
   56.6131 Location of explosive material storage facilities.
30:1.0.1.8.29.5.47.7SECTION 56.6132
   56.6132 Magazine requirements.
30:1.0.1.8.29.5.47.8SECTION 56.6133
   56.6133 Powder chests.
30:1.0.1.8.29.5.48SUBJGRP 48
Transportation
30:1.0.1.8.29.5.48.9SECTION 56.6200
   56.6200 Delivery to storage or blast site areas.
30:1.0.1.8.29.5.48.10SECTION 56.6201
   56.6201 Separation of transported explosive material.
30:1.0.1.8.29.5.48.11SECTION 56.6202
   56.6202 Vehicles.
30:1.0.1.8.29.5.48.12SECTION 56.6203
   56.6203 Locomotives.
30:1.0.1.8.29.5.48.13SECTION 56.6204
   56.6204 Hoists.
30:1.0.1.8.29.5.48.14SECTION 56.6205
   56.6205 Conveying explosives by hand.
30:1.0.1.8.29.5.49SUBJGRP 49
Use
30:1.0.1.8.29.5.49.15SECTION 56.6300
   56.6300 Control of blasting operations.
30:1.0.1.8.29.5.49.16SECTION 56.6301
   56.6301 Blasthole obstruction check.
30:1.0.1.8.29.5.49.17SECTION 56.6302
   56.6302 Separation of explosive material.
30:1.0.1.8.29.5.49.18SECTION 56.6303
   56.6303 Initiation preparation.
30:1.0.1.8.29.5.49.19SECTION 56.6304
   56.6304 Primer protection.
30:1.0.1.8.29.5.49.20SECTION 56.6305
   56.6305 Unused explosive material.
30:1.0.1.8.29.5.49.21SECTION 56.6306
   56.6306 Loading, blasting, and security.
30:1.0.1.8.29.5.49.22SECTION 56.6307
   56.6307 Drill stem loading.
30:1.0.1.8.29.5.49.23SECTION 56.6308
   56.6308 Initiation systems.
30:1.0.1.8.29.5.49.24SECTION 56.6309
   56.6309 Fuel oil requirements for ANFO.
30:1.0.1.8.29.5.49.25SECTION 56.6310
   56.6310 Misfire waiting period.
30:1.0.1.8.29.5.49.26SECTION 56.6311
   56.6311 Handling of misfires.
30:1.0.1.8.29.5.49.27SECTION 56.6312
   56.6312 Secondary blasting.
30:1.0.1.8.29.5.50SUBJGRP 50
Electric Blasting
30:1.0.1.8.29.5.50.28SECTION 56.6400
   56.6400 Compatibility of electric detonators.
30:1.0.1.8.29.5.50.29SECTION 56.6401
   56.6401 Shunting.
30:1.0.1.8.29.5.50.30SECTION 56.6402
   56.6402 Deenergized circuits near detonators.
30:1.0.1.8.29.5.50.31SECTION 56.6403
   56.6403 Branch circuits.
30:1.0.1.8.29.5.50.32SECTION 56.6404
   56.6404 Separation of blasting circuits from power source.
30:1.0.1.8.29.5.50.33SECTION 56.6405
   56.6405 Firing devices.
30:1.0.1.8.29.5.50.34SECTION 56.6406
   56.6406 Duration of current flow.
30:1.0.1.8.29.5.50.35SECTION 56.6407
   56.6407 Circuit testing.
30:1.0.1.8.29.5.51SUBJGRP 51
Nonelectric Blasting
30:1.0.1.8.29.5.51.36SECTION 56.6500
   56.6500 Damaged initiating material.
30:1.0.1.8.29.5.51.37SECTION 56.6501
   56.6501 Nonelectric initiation systems.
30:1.0.1.8.29.5.51.38SECTION 56.6502
   56.6502 Safety fuse.
30:1.0.1.8.29.5.52SUBJGRP 52
Extraneous Electricity
30:1.0.1.8.29.5.52.39SECTION 56.6600
   56.6600 Loading practices.
30:1.0.1.8.29.5.52.40SECTION 56.6601
   56.6601 Grounding.
30:1.0.1.8.29.5.52.41SECTION 56.6602
   56.6602 Static electricity dissipation during loading.
30:1.0.1.8.29.5.52.42SECTION 56.6603
   56.6603 Air gap.
30:1.0.1.8.29.5.52.43SECTION 56.6604
   56.6604 Precautions during storms.
30:1.0.1.8.29.5.52.44SECTION 56.6605
   56.6605 Isolation of blasting circuits.
30:1.0.1.8.29.5.53SUBJGRP 53
Equipment/Tools
30:1.0.1.8.29.5.53.45SECTION 56.6700
   56.6700 Nonsparking tools.
30:1.0.1.8.29.5.53.46SECTION 56.6701
   56.6701 Tamping and loading pole requirements.
30:1.0.1.8.29.5.54SUBJGRP 54
Maintenance
30:1.0.1.8.29.5.54.47SECTION 56.6800
   56.6800 Storage facilities.
30:1.0.1.8.29.5.54.48SECTION 56.6801
   56.6801 Vehicle repair.
30:1.0.1.8.29.5.54.49SECTION 56.6802
   56.6802 Bulk delivery vehicles.
30:1.0.1.8.29.5.54.50SECTION 56.6803
   56.6803 Blasting lines.
30:1.0.1.8.29.5.55SUBJGRP 55
General Requirements
30:1.0.1.8.29.5.55.51SECTION 56.6900
   56.6900 Damaged or deteriorated explosive material.
30:1.0.1.8.29.5.55.52SECTION 56.6901
   56.6901 Black powder.
30:1.0.1.8.29.5.55.53SECTION 56.6902
   56.6902 Excessive temperatures.
30:1.0.1.8.29.5.55.54SECTION 56.6903
   56.6903 Burning explosive material.
30:1.0.1.8.29.5.55.55SECTION 56.6904
   56.6904 Smoking and open flames.
30:1.0.1.8.29.5.55.56SECTION 56.6905
   56.6905 Protection of explosive material.