Title 30
PART 33 SUBPART C
Subpart C - Test Requirements
- 30 U.S.C. 957, 961.
- Schedule 25B, 25 FR 6473, July 9, 1960, unless otherwise noted.
30:1.0.1.2.15.3.1.1 | SECTION 33.30 | 33.30 Test site. | |
30:1.0.1.2.15.3.1.2 | SECTION 33.31 | 33.31 Test space. | |
30:1.0.1.2.15.3.1.3 | SECTION 33.32 | 33.32 Determination of dust concentration. | |
30:1.0.1.2.15.3.1.4 | SECTION 33.33 | 33.33 Allowable limits of dust concentration. | |
30:1.0.1.2.15.3.1.5 | SECTION 33.34 | 33.34 Drilling test. | |
30:1.0.1.2.15.3.1.6 | SECTION 33.35 | 33.35 Methods of drilling; dust-collector unit. | |
30:1.0.1.2.15.3.1.7 | SECTION 33.36 | 33.36 Method of drilling; combination unit or dust-collecting system. | |
30:1.0.1.2.15.3.1.8 | SECTION 33.37 | 33.37 Test procedure. | |
30:1.0.1.2.15.3.1.9 | SECTION 33.38 | 33.38 Electrical parts. |