Title 29
PART 1919 SUBPART E
Subpart E - Certification of Vessels: Tests and Proof Loads; Heat Treatment; Competent Persons
- 33 U.S.C. 941; 29 U.S.C. 653, 655, 657); Secretary of Labor's Order No. 12-71 (36 FR 8754), 8-76 (41 FR 25059), 9-83 (48 FR 35736), 1-90 (55 FR 9033), 6-96 (62 FR 111), 3-2000 (65 FR 50017), 5-2002 (67 FR 65008), 5-2007 (72 FR 31160), or 4-2010 (75 FR 55355), as applicable; and 29 CFR 1911.
- 39 FR 22096, June 19, 1974, unless otherwise noted.
29:7.1.1.1.8.5.6.1 | SECTION 1919.26 | 1919.26 Visual inspection before tests. | |
29:7.1.1.1.8.5.6.2 | SECTION 1919.27 | 1919.27 Unit proof tests - winches, derricks and gear accessory thereto. | |
29:7.1.1.1.8.5.6.3 | SECTION 1919.28 | 1919.28 Unit proof tests - cranes and gear accessory thereto. | |
29:7.1.1.1.8.5.6.4 | SECTION 1919.29 | 1919.29 Limitations on safe working loads and proof loads. | |
29:7.1.1.1.8.5.6.5 | SECTION 1919.30 | 1919.30 Examinations subsequent to unit tests. | |
29:7.1.1.1.8.5.6.6 | SECTION 1919.31 | 1919.31 Proof tests - loose gear. | |
29:7.1.1.1.8.5.6.7 | SECTION 1919.32 | 1919.32 Specially designed blocks and components. | |
29:7.1.1.1.8.5.6.8 | SECTION 1919.33 | 1919.33 Proof tests - wire rope. | |
29:7.1.1.1.8.5.6.9 | SECTION 1919.34 | 1919.34 Proof tests after repairs or alterations. | |
29:7.1.1.1.8.5.6.10 | SECTION 1919.35 | 1919.35 Order of tests. | |
29:7.1.1.1.8.5.6.11 | SECTION 1919.36 | 1919.36 Heat treatment. | |
29:7.1.1.1.8.5.6.12 | SECTION 1919.37 | 1919.37 Competent persons. |