eCFR.io
Daily eCFR

§ 111.60 What are the design requirements for the production and process control system?

21 CFR 111.60

Citation21 CFR 111.60
CorpusDaily eCFR
Displayed edition2026-09-10
Last updated2026-09-10

§ 111.60 What are the design requirements for the production and process control system?

(a) Your production and in-process control system must be designed to ensure that the dietary supplement is manufactured, packaged, labeled, and held in a manner that will ensure the quality of the dietary supplement and that the dietary supplement is packaged and labeled as specified in the master manufacturing record; and

(b) The production and in-process control system must include all requirements of subparts E through L of this part and must be reviewed and approved by quality control personnel.