§ 115.28 Application for approval.Each application by a manufacturer or an owner for certification of a container by design type must include:
(a) Three copies, each no larger than 3 feet by 4 feet, of the customs and TIR/Container plan;
(b) Customs and TIR/Container plan number;
(c) Three copies of the specifications which include the following information:
(1) The name and address of the manufacturer and the owner; and
(2) A description of the container including the -
(i) Type of construction;
(ii) Dimensions;
(iii) Material of construction;
(iv) Coating system used;
(v) Identification marks and numbers; and
(vi) Tare weight;
(d) The location and date for inspection; and
(e) A statement signed by the manufacturer that:
(1) A container of the design type concerned is available for inspection and approval by the Certifying Authority before, during, and after the production run;
(2) Notification will be given to the Certifying Authority of each change in the design before adoption; and
(3) Each container will be marked with:
(i) The metal plate required in § 115.32;
(ii) The identification number or letter of the design type assigned by the manufacturer; and
(iii) The serial number of the container assigned by the manufacturer.