Appendix B to Part 415 - Safety Review Document Outline
14:4.0.2.9.9.9.24.1.15 : Appendix B
Appendix B to Part 415 - Safety Review Document Outline
This appendix contains the format and numbering scheme for a
safety review document to be filed as part of an application for a
launch license as required by subpart F of part 415. The applicable
sections of parts 413, 415, and 417 of this chapter are referenced
in the outline below.
Safety Review Document 1.0 Launch Description (§ 415.109) 1.1
Launch Site Description 1.2 Launch Vehicle Description 1.3 Payload
Description 1.4 Trajectory 1.5 Staging Events 1.6 Vehicle
Performance Graphs 2.0 Launch Operator Organization (§ 415.111) 2.1
Launch Operator Organization (§ 415.111 and § 417.103 of this
chapter) 2.1.1 Organization Summary 2.1.3 Organization Charts 2.1.4
Office Descriptions and Safety Functions 3.0 Launch Personnel
Certification Program (§ 415.113 and § 417.105 of this chapter) 3.1
Program Summary 3.2 Program Implementation Document(s) 3.3 Table of
Safety Critical Tasks Performed by Certified Personnel 4.0 Flight
Safety (§ 415.115) 4.1 Initial Flight Safety Analysis 4.1.1 Flight
Safety Sub-Analyses, Methods, and Assumptions 4.1.2 Sample
Calculation and Products 4.1.3 Launch Specific Updates and Final
Flight Safety Analysis Data 4.2 Radionuclide Data (where
applicable) 4.3 Flight Safety Plan 4.3.1 Flight Safety Personnel
4.3.2 Flight Safety Rules 4.3.3 Flight Safety System Summary and
Preflight Tests 4.3.4 Trajectory and Debris Dispersion Data 4.3.5
Flight Hazard Areas and Safety Clear Zones 4.3.6 Support Systems
and Services 4.3.7 Flight Safety Operations 4.3.8 Unguided
Suborbital Launch Vehicles (where applicable) 5.0 Ground Safety (§
415.117) 5.1 Ground Safety Analysis Report 5.2 Ground Safety Plan
6.0 Launch Plans (§ 415.119 and § 417.111 of this chapter) 6.1
Launch Support Equipment and Instrumentation Plan 6.2 Configuration
Management and Control Plan 6.3 Frequency Management Plan 6.4
Flight Termination System Electronic Piece Parts Program Plan 6.5
Accident Investigation Plan 6.6 Local Agreements and Public
Coordination Plan 6.7 Hazard Area Surveillance and Clearance Plan
6.8 Communications Plan 7.0 Launch Schedule (§ 415.121) 7.1 Launch
Processing Schedule 8.0 Computing Systems and Software (§ 415.123)
8.1 Hardware and Software Descriptions 8.2 Flow Charts and Diagrams
8.3 Logic Diagrams and Software Design Descriptions 8.4 Operator
User Manuals and Documentation 8.5 Software Hazard Analyses 8.6
Software Test Plans, Test Procedures, and Test Results 8.7 Software
Development Plan 9.0 Unique Safety Policies, Requirements and
Practices (§ 415.125) 10.0 Flight Safety System Design and
Operation Data (§ 415.127) 10.1 Flight Safety System Description
10.2 Flight Safety System Diagram 10.3 Flight Safety System
Subsystem Design Information 10.4 Flight Safety System Analyses
10.5 Flight Termination System Environmental Design 10.6 Flight
Safety System Compliance Matrix 10.7 Flight Termination System
Installation Procedures 10.8 Tracking System Validation Procedures
11.0 Flight Safety System Test Data (§ 415.129) 11.1 Testing
Compliance Matrix 11.2 Test Program Overview and Schedule 11.3
Flight Safety System Test Plans and Procedures 11.4 Test Reports
11.5 Reuse of Flight Termination System Components 12.0 Flight
Safety System Crew Data (§ 415.131) 12.1 Position Descriptions 12.2
Certification and Training Program Description 13.0 Safety at End
of Launch (§ 415.133) [Doc. No. FAA-2000-7953, 71 FR 50536, Aug.
25, 2006]