Title 10
PART 960
Part 960 - General Guidelines For The Preliminary Screening Of Potential Sites For A Nuclear Waste Repository
- Authority: 42 U.S.C. 2011 et seq., 42 U.S.C. 7101 et seq., 42 U.S.C. 10101 et seq.
- Source: 49 FR 47752, Dec. 6, 1984, unless otherwise noted.
10:4.0.2.5.42.1 | SUBPART A | Subpart A - General Provisions | |
10:4.0.2.5.42.1.77.1 | SECTION 960.1 | 960.1 Applicability. | |
10:4.0.2.5.42.1.77.2 | SECTION 960.2 | 960.2 Definitions. | |
10:4.0.2.5.42.2 | SUBPART B | Subpart B - Implementation Guidelines | |
10:4.0.2.5.42.2.77.1 | SECTION 960.3 | 960.3 Implementation guidelines. | |
10:4.0.2.5.42.2.77.2 | SECTION 960.3-1 | 960.3-1 Siting provisions. | |
10:4.0.2.5.42.2.77.3 | SECTION 960.3-1-1 | 960.3-1-1 Diversity of geohydrologic settings. | |
10:4.0.2.5.42.2.77.4 | SECTION 960.3-1-2 | 960.3-1-2 Diversity of rock types. | |
10:4.0.2.5.42.2.77.5 | SECTION 960.3-1-3 | 960.3-1-3 Regionality. | |
10:4.0.2.5.42.2.77.6 | SECTION 960.3-1-4 | 960.3-1-4 Evidence for siting decisions. | |
10:4.0.2.5.42.2.77.7 | SECTION 960.3-1-4-1 | 960.3-1-4-1 Site identification as potentially acceptable. | |
10:4.0.2.5.42.2.77.8 | SECTION 960.3-1-4-2 | 960.3-1-4-2 Site nomination for characterization. | |
10:4.0.2.5.42.2.77.9 | SECTION 960.3-1-4-3 | 960.3-1-4-3 Site recommendation for characterization. | |
10:4.0.2.5.42.2.77.10 | SECTION 960.3-1-5 | 960.3-1-5 Basis for site evaluations. | |
10:4.0.2.5.42.2.77.11 | SECTION 960.3-2 | 960.3-2 Siting process. | |
10:4.0.2.5.42.2.77.12 | SECTION 960.3-2-1 | 960.3-2-1 Site screening for potentially acceptable sites. | |
10:4.0.2.5.42.2.77.13 | SECTION 960.3-2-2 | 960.3-2-2 Nomination of sites as suitable for characterization. | |
10:4.0.2.5.42.2.77.14 | SECTION 960.3-2-2-1 | 960.3-2-2-1 Evaluation of all potentially acceptable sites. | |
10:4.0.2.5.42.2.77.15 | SECTION 960.3-2-2-2 | 960.3-2-2-2 Selection of sites within geohydrologic settings. | |
10:4.0.2.5.42.2.77.16 | SECTION 960.3-2-2-3 | 960.3-2-2-3 Comparative evaluation of all sites proposed for nomination. | |
10:4.0.2.5.42.2.77.17 | SECTION 960.3-2-2-4 | 960.3-2-2-4 The environmental assessment. | |
10:4.0.2.5.42.2.77.18 | SECTION 960.3-2-2-5 | 960.3-2-2-5 Formal site nomination. | |
10:4.0.2.5.42.2.77.19 | SECTION 960.3-2-3 | 960.3-2-3 Recommendation of sites for characterization. | |
10:4.0.2.5.42.2.77.20 | SECTION 960.3-3 | 960.3-3 Consultation. | |
10:4.0.2.5.42.2.77.21 | SECTION 960.3-4 | 960.3-4 Environmental impacts. | |
10:4.0.2.5.42.3 | SUBPART C | Subpart C - Postclosure Guidelines | |
10:4.0.2.5.42.3.77.1 | SECTION 960.4 | 960.4 Postclosure guidelines. | |
10:4.0.2.5.42.3.77.2 | SECTION 960.4-1 | 960.4-1 System guideline. | |
10:4.0.2.5.42.3.77.3 | SECTION 960.4-2 | 960.4-2 Technical guidelines. | |
10:4.0.2.5.42.3.77.4 | SECTION 960.4-2-1 | 960.4-2-1 Geohydrology. | |
10:4.0.2.5.42.3.77.5 | SECTION 960.4-2-2 | 960.4-2-2 Geochemistry. | |
10:4.0.2.5.42.3.77.6 | SECTION 960.4-2-3 | 960.4-2-3 Rock characteristics. | |
10:4.0.2.5.42.3.77.7 | SECTION 960.4-2-4 | 960.4-2-4 Climatic changes. | |
10:4.0.2.5.42.3.77.8 | SECTION 960.4-2-5 | 960.4-2-5 Erosion. | |
10:4.0.2.5.42.3.77.9 | SECTION 960.4-2-6 | 960.4-2-6 Dissolution. | |
10:4.0.2.5.42.3.77.10 | SECTION 960.4-2-7 | 960.4-2-7 Tectonics. | |
10:4.0.2.5.42.3.77.11 | SECTION 960.4-2-8 | 960.4-2-8 Human interference. | |
10:4.0.2.5.42.3.77.12 | SECTION 960.4-2-8-1 | 960.4-2-8-1 Natural resources. | |
10:4.0.2.5.42.3.77.13 | SECTION 960.4-2-8-2 | 960.4-2-8-2 Site ownership and control. | |
10:4.0.2.5.42.4 | SUBPART D | Subpart D - Preclosure Guidelines | |
10:4.0.2.5.42.4.77 | SUBJGRP 77 | Preclosure Radiological Safety | |
10:4.0.2.5.42.4.77.1 | SECTION 960.5 | 960.5 Preclosure guidelines. | |
10:4.0.2.5.42.4.77.2 | SECTION 960.5-1 | 960.5-1 System guidelines. | |
10:4.0.2.5.42.4.77.3 | SECTION 960.5-2 | 960.5-2 Technical guidelines. | |
10:4.0.2.5.42.4.77.4 | SECTION 960.5-2-1 | 960.5-2-1 Population density and distribution. | |
10:4.0.2.5.42.4.77.5 | SECTION 960.5-2-2 | 960.5-2-2 Site ownership and control. | |
10:4.0.2.5.42.4.77.6 | SECTION 960.5-2-3 | 960.5-2-3 Meteorology. | |
10:4.0.2.5.42.4.77.7 | SECTION 960.5-2-4 | 960.5-2-4 Offsite installations and operations. | |
10:4.0.2.5.42.4.78 | SUBJGRP 78 | Environment, Socioeconomics, and Transportation | |
10:4.0.2.5.42.4.78.8 | SECTION 960.5-2-5 | 960.5-2-5 Environmental quality. | |
10:4.0.2.5.42.4.78.9 | SECTION 960.5-2-6 | 960.5-2-6 Socioeconomic impacts. | |
10:4.0.2.5.42.4.78.10 | SECTION 960.5-2-7 | 960.5-2-7 Transportation. | |
10:4.0.2.5.42.4.79 | SUBJGRP 79 | Ease and Cost of Siting, Construction, Operation, and Closure | |
10:4.0.2.5.42.4.79.11 | SECTION 960.5-2-8 | 960.5-2-8 Surface characteristics. | |
10:4.0.2.5.42.4.79.12 | SECTION 960.5-2-9 | 960.5-2-9 Rock characteristics. | |
10:4.0.2.5.42.4.79.13 | SECTION 960.5-2-10 | 960.5-2-10 Hydrology. | |
10:4.0.2.5.42.4.79.14 | SECTION 960.5-2-11 | 960.5-2-11 Tectonics. | |
10:4.0.2.5.42.4.80.15.30 | APPENDIX Appendix I | Appendix I to Part 960 - NRC and EPA Requirements for Postclosure Repository Performance | |
10:4.0.2.5.42.4.80.15.31 | APPENDIX Appendix II | Appendix II to Part 960 - NRC and EPA Requirements for Preclosure Repository Performance | |
10:4.0.2.5.42.4.80.15.32 | APPENDIX Appendix III | Appendix III to Part 960 - Application of the System and Technical Guidelines During the Siting Process | |
10:4.0.2.5.42.4.80.15.33 | APPENDIX Appendix IV | Appendix IV to Part 960 - Types of Information for the Nomination of Sites as Suitable for Characterization |