Title 49

PART 192 SUBPART g

Subpart G - General Construction Requirements for Transmission Lines and Mains

49:3.1.1.2.8.7.8.1SECTION 192.301
   192.301 Scope.
49:3.1.1.2.8.7.8.2SECTION 192.303
   192.303 Compliance with specifications or standards.
49:3.1.1.2.8.7.8.3SECTION 192.305
   192.305 Inspection: General.
49:3.1.1.2.8.7.8.5SECTION 192.307
   192.307 Inspection of materials.
49:3.1.1.2.8.7.8.6SECTION 192.309
   192.309 Repair of steel pipe.
49:3.1.1.2.8.7.8.7SECTION 192.311
   192.311 Repair of plastic pipe.
49:3.1.1.2.8.7.8.8SECTION 192.313
   192.313 Bends and elbows.
49:3.1.1.2.8.7.8.9SECTION 192.315
   192.315 Wrinkle bends in steel pipe.
49:3.1.1.2.8.7.8.10SECTION 192.317
   192.317 Protection from hazards.
49:3.1.1.2.8.7.8.11SECTION 192.319
   192.319 Installation of pipe in a ditch.
49:3.1.1.2.8.7.8.12SECTION 192.321
   192.321 Installation of plastic pipe.
49:3.1.1.2.8.7.8.13SECTION 192.323
   192.323 Casing.
49:3.1.1.2.8.7.8.14SECTION 192.325
   192.325 Underground clearance.
49:3.1.1.2.8.7.8.15SECTION 192.327
   192.327 Cover.
49:3.1.1.2.8.7.8.16SECTION 192.328
   192.328 Additional construction requirements for steel pipe using alternative maximum allowable operating pressure.
49:3.1.1.2.8.7.8.17SECTION 192.329
   192.329 Installation of plastic pipelines by trenchless excavation.