925.202 Exceptions.
(a)(2) Contracting officers may make the determination required by 48 CFR 25.202(a)(2), if the cost of the materials is not expected to exceed $100,000.
[75 FR 69013, Nov. 10, 2010]
48 CFR 925.202
(a)(2) Contracting officers may make the determination required by 48 CFR 25.202(a)(2), if the cost of the materials is not expected to exceed $100,000.
[75 FR 69013, Nov. 10, 2010]