Title 46

PART 52 SUBPART 52.01

Subpart 52.01 - General Requirements

46:2.0.1.2.10.1.1.1SECTION 52.01-1
   52.01-1 Incorporation by reference.
46:2.0.1.2.10.1.1.2SECTION 52.01-2
   52.01-2 Adoption of section I of the ASME Boiler and Pressure Vessel Code.
46:2.0.1.2.10.1.1.3SECTION 52.01-3
   52.01-3 Definitions of terms used in this part.
46:2.0.1.2.10.1.1.4SECTION 52.01-5
   52.01-5 Plans.
46:2.0.1.2.10.1.1.5SECTION 52.01-10
   52.01-10 Automatic controls.
46:2.0.1.2.10.1.1.6SECTION 52.01-35
   52.01-35 Auxiliary, donkey, fired thermal fluid heater, and heating boilers.
46:2.0.1.2.10.1.1.7SECTION 52.01-40
   52.01-40 Materials and workmanship.
46:2.0.1.2.10.1.1.8SECTION 52.01-50
   52.01-50 Fusible plugs (modifies A-19 through A-21).
46:2.0.1.2.10.1.1.9SECTION 52.01-55
   52.01-55 Increase in maximum allowable working pressure.
46:2.0.1.2.10.1.1.10SECTION 52.01-90
   52.01-90 Materials (modifies PG-5 through PG-13).
46:2.0.1.2.10.1.1.11SECTION 52.01-95
   52.01-95 Design (modifies PG-16 through PG-31 and PG-100).
46:2.0.1.2.10.1.1.12SECTION 52.01-100
   52.01-100 Openings and compensation (modifies PG-32 through PG-39, PG-42 through PG-55).
46:2.0.1.2.10.1.1.13SECTION 52.01-105
   52.01-105 Piping, valves and fittings (modifies PG-58 and PG-59).
46:2.0.1.2.10.1.1.14SECTION 52.01-110
   52.01-110 Water-level indicators, water columns, gauge-glass connections, gauge cocks, and pressure gauges (modifies PG-60).
46:2.0.1.2.10.1.1.15SECTION 52.01-115
   52.01-115 Feedwater supply (modifies PG-61).
46:2.0.1.2.10.1.1.16SECTION 52.01-120
   52.01-120 Safety valves and safety relief valves (modifies PG-67 through PG-73).
46:2.0.1.2.10.1.1.17SECTION 52.01-130
   52.01-130 Installation.
46:2.0.1.2.10.1.1.18SECTION 52.01-135
   52.01-135 Inspection and tests (modifies PG-90 through PG-100).
46:2.0.1.2.10.1.1.19SECTION 52.01-140
   52.01-140 Certification by stamping (modifies PG-104 through PG-113).
46:2.0.1.2.10.1.1.20SECTION 52.01-145
   52.01-145 Manufacturers' data report forms (modifies PG-112 and PG-113).