Title 49

PART 195 SUBPART c

Subpart C - Design Requirements

49:3.1.1.2.11.3.20.1SECTION 195.100
   195.100 Scope.
49:3.1.1.2.11.3.20.2SECTION 195.101
   195.101 Qualifying metallic components other than pipe.
49:3.1.1.2.11.3.20.3SECTION 195.102
   195.102 Design temperature.
49:3.1.1.2.11.3.20.4SECTION 195.104
   195.104 Variations in pressure.
49:3.1.1.2.11.3.20.5SECTION 195.106
   195.106 Internal design pressure.
49:3.1.1.2.11.3.20.6SECTION 195.108
   195.108 External pressure.
49:3.1.1.2.11.3.20.7SECTION 195.110
   195.110 External loads.
49:3.1.1.2.11.3.20.8SECTION 195.111
   195.111 Fracture propagation.
49:3.1.1.2.11.3.20.9SECTION 195.112
   195.112 New pipe.
49:3.1.1.2.11.3.20.10SECTION 195.114
   195.114 Used pipe.
49:3.1.1.2.11.3.20.11SECTION 195.116
   195.116 Valves.
49:3.1.1.2.11.3.20.12SECTION 195.118
   195.118 Fittings.
49:3.1.1.2.11.3.20.13SECTION 195.120
   195.120 Passage of internal inspection devices.
49:3.1.1.2.11.3.20.14SECTION 195.122
   195.122 Fabricated branch connections.
49:3.1.1.2.11.3.20.15SECTION 195.124
   195.124 Closures.
49:3.1.1.2.11.3.20.16SECTION 195.126
   195.126 Flange connection.
49:3.1.1.2.11.3.20.17SECTION 195.128
   195.128 Station piping.
49:3.1.1.2.11.3.20.18SECTION 195.130
   195.130 Fabricated assemblies.
49:3.1.1.2.11.3.20.19SECTION 195.132
   195.132 Design and construction of aboveground breakout tanks.
49:3.1.1.2.11.3.20.20SECTION 195.134
   195.134 Leak detection.