Title 49

PART 192 SUBPART e

Subpart E - Welding of Steel in Pipelines

49:3.1.1.2.8.5.8.1SECTION 192.221
   192.221 Scope.
49:3.1.1.2.8.5.8.2SECTION 192.225
   192.225 Welding procedures.
49:3.1.1.2.8.5.8.3SECTION 192.227
   192.227 Qualification of welders and welding operators.
49:3.1.1.2.8.5.8.4SECTION 192.229
   192.229 Limitations on welders and welding operators.
49:3.1.1.2.8.5.8.5SECTION 192.231
   192.231 Protection from weather.
49:3.1.1.2.8.5.8.6SECTION 192.233
   192.233 Miter joints.
49:3.1.1.2.8.5.8.7SECTION 192.235
   192.235 Preparation for welding.
49:3.1.1.2.8.5.8.8SECTION 192.241
   192.241 Inspection and test of welds.
49:3.1.1.2.8.5.8.9SECTION 192.243
   192.243 Nondestructive testing.
49:3.1.1.2.8.5.8.10SECTION 192.245
   192.245 Repair or removal of defects.