Title 40

PART 60 SUBPART cccc

Subpart CCCC - Standards of Performance for Commercial and Industrial Solid Waste Incineration Units Source:84 FR 15853, Apr. 16, 2019, unless otherwise noted.

40:8.0.1.1.1.30.195SUBJGRP 195
Introduction
40:8.0.1.1.1.30.195.1SECTION 60.2000
   60.2000 What does this subpart do
40:8.0.1.1.1.30.195.2SECTION 60.2005
   60.2005 When did this subpart become effective
40:8.0.1.1.1.30.196SUBJGRP 196
Applicability
40:8.0.1.1.1.30.196.3SECTION 60.2010
   60.2010 Does this subpart apply to my incineration unit
40:8.0.1.1.1.30.196.4SECTION 60.2015
   60.2015 What is a new incineration unit
40:8.0.1.1.1.30.196.5SECTION 60.2020
   60.2020 What combustion units are exempt from this subpart
40:8.0.1.1.1.30.196.6SECTION 60.2030
   60.2030 Who implements and enforces this subpart
40:8.0.1.1.1.30.196.7SECTION 60.2035
   60.2035 How are these new source performance standards structured
40:8.0.1.1.1.30.196.8SECTION 60.2040
   60.2040 Do all eleven components of these new source performance standards apply at the same time
40:8.0.1.1.1.30.197SUBJGRP 197
Preconstruction Siting Analysis
40:8.0.1.1.1.30.197.9SECTION 60.2045
   60.2045 Who must prepare a siting analysis
40:8.0.1.1.1.30.197.10SECTION 60.2050
   60.2050 What is a siting analysis
40:8.0.1.1.1.30.198SUBJGRP 198
Waste Management Plan
40:8.0.1.1.1.30.198.11SECTION 60.2055
   60.2055 What is a waste management plan
40:8.0.1.1.1.30.198.12SECTION 60.2060
   60.2060 When must I submit my waste management plan
40:8.0.1.1.1.30.198.13SECTION 60.2065
   60.2065 What should I include in my waste management plan
40:8.0.1.1.1.30.199SUBJGRP 199
Operator Training and Qualification
40:8.0.1.1.1.30.199.14SECTION 60.2070
   60.2070 What are the operator training and qualification requirements
40:8.0.1.1.1.30.199.15SECTION 60.2075
   60.2075 When must the operator training course be completed
40:8.0.1.1.1.30.199.16SECTION 60.2080
   60.2080 How do I obtain my operator qualification
40:8.0.1.1.1.30.199.17SECTION 60.2085
   60.2085 How do I maintain my operator qualification
40:8.0.1.1.1.30.199.18SECTION 60.2090
   60.2090 How do I renew my lapsed operator qualification
40:8.0.1.1.1.30.199.19SECTION 60.2095
   60.2095 What site-specific documentation is required
40:8.0.1.1.1.30.199.20SECTION 60.2100
   60.2100 What if all the qualified operators are temporarily not accessible
40:8.0.1.1.1.30.200SUBJGRP 200
Emission Limitations and Operating Limits
40:8.0.1.1.1.30.200.21SECTION 60.2105
   60.2105 What emission limitations must I meet and by when
40:8.0.1.1.1.30.200.22SECTION 60.2110
   60.2110 What operating limits must I meet and by when
40:8.0.1.1.1.30.200.23SECTION 60.2115
   60.2115 What if I do not use a wet scrubber, fabric filter, activated carbon injection, selective noncatalytic reduction, an electrostatic precipitator, or a dry scrubber to comply with the emission limitations
40:8.0.1.1.1.30.201SUBJGRP 201
Performance Testing
40:8.0.1.1.1.30.201.24SECTION 60.2125
   60.2125 How do I conduct the initial and annual performance test
40:8.0.1.1.1.30.201.25SECTION 60.2130
   60.2130 How are the performance test data used
40:8.0.1.1.1.30.202SUBJGRP 202
Initial Compliance Requirements
40:8.0.1.1.1.30.202.26SECTION 60.2135
   60.2135 How do I demonstrate initial compliance with the emission limitations and establish the operating limits
40:8.0.1.1.1.30.202.27SECTION 60.2140
   60.2140 By what date must I conduct the initial performance test
40:8.0.1.1.1.30.202.28SECTION 60.2141
   60.2141 By what date must I conduct the initial air pollution control device inspection
40:8.0.1.1.1.30.203SUBJGRP 203
Continuous Compliance Requirements
40:8.0.1.1.1.30.203.29SECTION 60.2145
   60.2145 How do I demonstrate continuous compliance with the emission limitations and the operating limits
40:8.0.1.1.1.30.203.30SECTION 60.2150
   60.2150 By what date must I conduct the annual performance test
40:8.0.1.1.1.30.203.31SECTION 60.2151
   60.2151 By what date must I conduct the annual air pollution control device inspection
40:8.0.1.1.1.30.203.32SECTION 60.2155
   60.2155 May I conduct performance testing less often
40:8.0.1.1.1.30.203.33SECTION 60.2160
   60.2160 May I conduct a repeat performance test to establish new operating limits
40:8.0.1.1.1.30.204SUBJGRP 204
Monitoring
40:8.0.1.1.1.30.204.34SECTION 60.2165
   60.2165 What monitoring equipment must I install and what parameters must I monitor
40:8.0.1.1.1.30.204.35SECTION 60.2170
   60.2170 Is there a minimum amount of monitoring data I must obtain
40:8.0.1.1.1.30.205SUBJGRP 205
Recordkeeping and Reporting
40:8.0.1.1.1.30.205.36SECTION 60.2175
   60.2175 What records must I keep
40:8.0.1.1.1.30.205.37SECTION 60.2180
   60.2180 Where and in what format must I keep my records
40:8.0.1.1.1.30.205.38SECTION 60.2185
   60.2185 What reports must I submit
40:8.0.1.1.1.30.205.39SECTION 60.2190
   60.2190 What must I submit prior to commencing construction
40:8.0.1.1.1.30.205.40SECTION 60.2195
   60.2195 What information must I submit prior to initial startup
40:8.0.1.1.1.30.205.41SECTION 60.2200
   60.2200 What information must I submit following my initial performance test
40:8.0.1.1.1.30.205.42SECTION 60.2205
   60.2205 When must I submit my annual report
40:8.0.1.1.1.30.205.43SECTION 60.2210
   60.2210 What information must I include in my annual report
40:8.0.1.1.1.30.205.44SECTION 60.2215
   60.2215 What else must I report if I have a deviation from the operating limits or the emission limitations
40:8.0.1.1.1.30.205.45SECTION 60.2220
   60.2220 What must I include in the deviation report
40:8.0.1.1.1.30.205.46SECTION 60.2225
   60.2225 What else must I report if I have a deviation from the requirement to have a qualified operator accessible
40:8.0.1.1.1.30.205.47SECTION 60.2230
   60.2230 Are there any other notifications or reports that I must submit
40:8.0.1.1.1.30.205.48SECTION 60.2235
   60.2235 In what form can I submit my reports
40:8.0.1.1.1.30.205.49SECTION 60.2240
   60.2240 Can reporting dates be changed
40:8.0.1.1.1.30.206SUBJGRP 206
Title V Operating Permits
40:8.0.1.1.1.30.206.50SECTION 60.2242
   60.2242 Am I required to apply for and obtain a Title V operating permit for my unit
40:8.0.1.1.1.30.207SUBJGRP 207
Air Curtain Incinerators (ACIs)
40:8.0.1.1.1.30.207.51SECTION 60.2245
   60.2245 What is an air curtain incinerator
40:8.0.1.1.1.30.207.52SECTION 60.2250
   60.2250 What are the emission limitations for air curtain incinerators
40:8.0.1.1.1.30.207.53SECTION 60.2255
   60.2255 How must I monitor opacity for air curtain incinerators
40:8.0.1.1.1.30.207.54SECTION 60.2260
   60.2260 What are the recordkeeping and reporting requirements for air curtain incinerators
40:8.0.1.1.1.30.208SUBJGRP 208
Definitions
40:8.0.1.1.1.30.208.55SECTION 60.2265
   60.2265 What definitions must I know
40:8.0.1.1.1.30.209.56.17APPENDIX
   Table 1 to Subpart CCCC of Part 60 - Emission Limitations for Incinerators for Which Construction is Commenced After November 30, 1999, But no Later Than June 4, 2010, or for Which Modification or Reconstruction is Commenced on or After June 1, 2001, But no Later Than August 7, 2013
40:8.0.1.1.1.30.209.56.18APPENDIX
   Table 2 to Subpart CCCC of Part 60 - Operating Limits for Wet Scrubbers
40:8.0.1.1.1.30.209.56.19APPENDIX
   Table 3 to Subpart CCCC of Part 60 - Toxic Equivalency Factors
40:8.0.1.1.1.30.209.56.20APPENDIX
   Table 4 to Subpart CCCC of Part 60 - Summary of Reporting Requirements 1
40:8.0.1.1.1.30.209.56.21APPENDIX
   Table 5 to Subpart CCCC of Part 60 - Emission Limitations for Incinerators That Commenced Construction After June 4, 2010, or That Commenced Reconstruction or Modification After August 7, 2013
40:8.0.1.1.1.30.209.56.22APPENDIX
   Table 6 to Subpart CCCC of Part 60 - Emission Limitations for Energy Recovery Units That Commenced Construction After June 4, 2010, or That Commenced Reconstruction or Modification After August 7, 2013
40:8.0.1.1.1.30.209.56.23APPENDIX
   Table 7 to Subpart CCCC of Part 60 - Emission Limitations for Waste-Burning Kilns That Commenced Construction After June 4, 2010, or Reconstruction or Modification After August 7, 2013
40:8.0.1.1.1.30.209.56.24APPENDIX
   Table 8 to Subpart CCCC of Part 60 - Emission Limitations for Small, Remote Incinerators That Commenced Construction After June 4, 2010, or That Commenced Reconstruction or Modification After August 7, 2013