Title 18

SECTION 806.14

806.14 Contents of application.

§ 806.14 Contents of application.

(a) Applications for a new project or a major modification to an existing approved project shall include, but not be limited to, the following information and, where applicable, shall be subject to the requirements in paragraph (b) of this section and submitted on forms and in the manner prescribed by the Commission.

(1) Identification of project sponsor including any and all proprietors, corporate officers or partners, the mailing address of the same, and the name of the individual authorized to act for the sponsor.

(2) Project location, including latitude and longitude coordinates in decimal degrees accurate to within 10 meters, the project location displayed on a map with a 7.5-minute USGS topographic base, and evidence of legal access to the property upon which the project is proposed.

(3) Project description, including: Purpose, proposed quantity to be withdrawn or consumed, if applicable, and identification of all water sources related to the project including location and date of initiation of each source.

(4) Anticipated impact of the project, including impacts on existing water withdrawals, nearby surface waters, and threatened or endangered species and their habitats.

(5) The reasonably foreseeable need for the proposed quantity of water to be withdrawn or consumed, including supporting calculations, and the projected demand for the term of the approval.

(6) A metering plan that adheres to § 806.30.

(7) Evidence of coordination and compliance with member jurisdictions regarding all necessary permits or approvals required for the project from other federal, state or local government agencies having jurisdiction over the project.

(8) Project estimated completion date and estimated construction schedule.

(9) Draft notices required by § 806.15.

(10) The Commission may also require the following information as deemed necessary:

(i) Engineering feasibility.

(ii) Ability of the project sponsor to fund the project.

(b) Additional information is required for a new project or a major modification to an existing approved project as follows.

(1) Surface water. (i) Water use and availability.

(ii) Project setting, including surface water characteristics, identification of wetlands, and site development considerations.

(iii) Description and design of intake structure.

(iv) Anticipated impact of the proposed project on local flood risk, recreational uses, fish and wildlife, and natural environment features.

(v) For new projects and major modifications to increase a withdrawal, alternatives analysis for a withdrawal proposed in settings with a drainage area of 50 miles square or less, or in a waterway with exceptional water quality, or as required by the Commission.

(2) Groundwater - (i) With the exception of mining related withdrawals solely for the purpose of dewatering; construction dewatering withdrawals and withdrawals for the sole purpose of groundwater or below water table remediation generally which are addressed in paragraph (b)(6) of this section, the project sponsor shall provide an interpretative report that includes all monitoring and results of a constant-rate aquifer test consistent with § 806.12 and an updated groundwater availability estimate if changed from the aquifer test plan, unless a request for a waiver of the requirements of § 806.12 is granted. The project sponsor shall obtain Commission approval of the test procedures prior to initiation of the constant-rate aquifer test.

(ii) Water use and availability.

(iii) Project setting, including nearby surface water features.

(iv) Groundwater elevation monitoring plan for all production wells.

(v) Alternatives analysis as required by the Commission.

(3) Consumptive use. (i) Consumptive use calculations, and a mitigation plan consistent with § 806.22(b).

(ii) Water conservation methods, design or technology proposed or considered.

(iii) Alternatives analysis as required by the Commission.

(4) Into basin diversions. (i) Provide the necessary information to demonstrate that the proposed project will meet the standards in § 806.24(c).

(ii) Identification of the source and water quality characteristics of the water to be diverted.

(5) Out of basin diversions. (i) Provide the necessary information to demonstrate that the proposed project will meet the standards in § 806.24(b).

(ii) Project setting.

(6) Other projects. Other projects, including without limitation, mine dewatering, construction dewatering, water resources remediation projects, and AMD remediation facilities that qualify as a withdrawal.

(i) In lieu of aquifer testing, report(s) prepared for any other purpose or as required by other governmental regulatory agencies that provides a demonstration of the hydrogeologic and/or hydrologic effects and limits of said effects due to operation of the proposed project and effects on local water availability.

(ii) [Reserved]

(c) All applications for renewal of expiring approved projects, including those with minor or major modifications, shall include, but not be limited to, the following information, and, where applicable, shall be subject to the requirements in paragraph (d) of this section and submitted on forms and in the manner prescribed by the Commission.

(1) Identification of project sponsor including any and all proprietors, corporate officers or partners, the mailing address of the same, and the name of the individual authorized to act for the sponsor.

(2) Project location, including latitude and longitude coordinates in decimal degrees accurate to within 10 meters, the project location displayed on map with a 7.5-minute USGS topographic base, and evidence of legal access to the property upon which the project is located.

(3) Project description, to include, but not be limited to: Purpose, proposed quantity to be withdrawn or consumed if applicable, identification of all water sources related to the project including location and date of initiation of each source, and any proposed project modifications.

(4) The reasonably foreseeable need for the requested renewal of the quantity of water to be withdrawn or consumed, including supporting calculations, and the projected demand for the term of the approval.

(5) An as-built and approved metering plan.

(6) Copies of permits from member jurisdictions regarding all necessary permits or approvals obtained for the project from other federal, state, or local government agencies having jurisdiction over the project.

(7) Copy of any approved mitigation or monitoring plan and any related as-built for the expiring project.

(8) Demonstration of registration of all withdrawals or consumptive uses in accordance with the applicable state requirements.

(9) Draft notices required by § 806.15.

(d) Additional information is required for the following applications for renewal of expiring approved projects.

(1) Surface water. (i) Historic water use quantities and timing of use.

(ii) Changes to stream flow or quality during the term of the expiring approval.

(iii) Changes to the facility design.

(iv) Any proposed changes to the previously authorized purpose.

(2) Groundwater. (i) The project sponsor shall provide an interpretative report that includes all monitoring and results of any constant-rate aquifer testing previously completed or submitted to support the original approval. In lieu of a testing report, historic operational data pumping and elevation data may be considered, as a request for waiver of the requirements of § 806.12. Those projects that did not have constant-rate aquifer testing completed for the original approval that was consistent with § 806.12 or sufficient historic operational pumping and groundwater elevation data may be required to complete constant-rate aquifer testing consistent with § 806.12, prepare and submit an interpretative report that includes all monitoring and results of any constant-rate aquifer test.

(ii) An interpretative report providing analysis and comparison of current and historic water withdrawal and groundwater elevation data with previously completed hydrogeologic report.

(iii) Current groundwater availability analysis assessing the availability of water during a 1-in-10 year recurrence interval under the existing conditions within the recharge area and predicted for term of renewal (i.e., other users, discharges, and land development within the groundwater recharge area).

(iv) Groundwater elevation monitoring plan for all production wells.

(v) Changes to the facility design.

(vi) Any proposed changes to the previously authorized purpose.

(3) Consumptive use. (i) Consumptive use calculations, and a copy of the approved plan or method for mitigation consistent with § 806.22.

(ii) Changes to the facility design.

(iii) Any proposed changes to the previously authorized purpose.

(4) Into basin diversion. (i) Provide the necessary information to demonstrate that the proposed project will meet the standards in § 806.24(c).

(ii) Identification of the source and water quality characteristics of the water to be diverted.

(iii) Changes to the facility design.

(iv) Any proposed changes to the previously authorized purpose.

(5) Out of basin diversion. (i) Historic water use quantities and timing of use.

(ii) Changes to stream flow or quality during the term of the expiring approval.

(iii) Changes to the facility design.

(iv) Any proposed changes to the previously authorized purpose,

(6) Other projects. Other projects, including without limitation, mine dewatering, water resources remediation projects, and AMD facilities that qualify as a withdrawal.

(i) Copy of approved report(s) prepared for any other purpose or as required by other governmental regulatory agencies that provides a demonstration of the hydrogeologic and/or hydrologic effects and limits of said effects due to operation of the project and effects on local water availability.

(ii) Any data or reports that demonstrate effects of the project are consistent with those reports provided in paragraph (d)(6)(i) of this section.

(iii) Demonstration of continued need for expiring approved water source and quantity.

(iv) Changes to the facility design.

(v) Any proposed changes to the previously authorized purpose.

(e) A report about the project prepared for any other purpose, or an application for approval prepared for submission to a member jurisdiction, may be accepted by the Commission provided the said report or application addresses all necessary items on the Commission's form or listed in this section, as appropriate.

(f) Applications for minor modifications must be complete and will be on a form and in a manner prescribed by the Commission. Applications for minor modifications must contain the following:

(1) Description of the project;

(2) Description of all sources, consumptive uses and diversions related to the project;

(3) Description of the requested modification;

(4) Statement of the need for the requested modification; and

(5) Demonstration that the anticipated impact of the requested modification will not adversely impact the water resources of the basin.

(g) For any applications, the Executive Director or Commission may require other information not otherwise listed in this section.

[82 FR 29390, June 29, 2017]